Indore · 7 km from our office
Solar panel installation in Old & New Palasia
Old & New Palasia, Indore
- From Vijay Nagar office
- ≈7 km
- Typical systems
- 3–10 kW
- DISCOM
- MP West Discom
- Home subsidy
- Up to ₹78,000
- Free service
- 5 years
Homes & roofs in Old
Older roofs deserve a structural check before adding load; trees in these leafy streets are the main shading factor.
What we recommend here
We inspect roof condition and slab strength first, then use ballast-free anchored structures sized to the slab. Tree shading is mapped month by month.
- Palasia Square
- 56 Dukan
- AB Road
The process
Seven steps. One team. Zero chasing.
01Day 0
Share your bill
WhatsApp a photo of your last electricity bill or use the calculator. We size a system from your real consumption, not a guess.
02Day 1–3
Free site survey
An engineer checks roof strength, orientation, shading across the seasons, cable routes, earthing points and your sanctioned load.
03Day 3–5
Design & transparent quote
Layout, structure height, module and inverter options, generation estimate and an itemised price. No surprises later.
04Week 1–2
Subsidy & DISCOM paperwork
Registration on the PM Surya Ghar portal, feasibility approval from MP West Discom, and loan paperwork if you choose finance.
051–3 days on site
Installation
Structure, modules, inverter, AC/DC distribution boxes, earthing and lightning protection — installed and tested by our crew.
06Usually 2–4 weeks
Inspection & net meter
DISCOM inspection and bi-directional net meter installation. We coordinate the visit with the DISCOM.
07After net meter
Commissioning & subsidy
System goes live, inverter monitoring is set up, and the subsidy claim is submitted. Then five years of free service visits.
Solar in Old: questions
My house is 40 years old. Can the roof take solar panels?
Most RCC roofs carry a solar array comfortably — modules and structure add roughly 15–20 kg per square metre. We inspect for cracks, seepage and slab thickness before designing the structure.
How much solar subsidy can I get in Madhya Pradesh?
Under PM Surya Ghar: Muft Bijli Yojana, homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW — ₹30,000 for 1 kW, ₹60,000 for 2 kW and a maximum of ₹78,000 for 3 kW or more. Housing societies and RWAs get ₹18,000 per kW for common facilities.
What is net metering and how does it work in Indore?
Net metering replaces your normal meter with a bi-directional meter that records both units you import from the grid and units your solar system exports. You are billed only for the net units. In Indore it is provided by MP West Discom (MPPKVVCL) under MPERC net-metering regulations.
Keep reading
- SolutionsResidential Rooftop Solar in IndoreHome solar systems in Indore from 1 kW to 15 kW with PM Surya Ghar subsidy up to ₹78,000, net metering, elevated structures, EMI and 5 years free service.
- GuidesPM Surya Ghar Solar Subsidy in MP (2026)Complete guide to PM Surya Ghar: Muft Bijli Yojana in Madhya Pradesh — subsidy amounts, eligibility, documents, step-by-step application in Indore and timelines.
- GuidesSolar Panel Price in Indore (2026)Rooftop solar system prices in Indore for 1–100 kW: cost before and after PM Surya Ghar subsidy, what's included, elevated structure cost and how to compare quotes.
- ProjectsSolar Projects in IndoreReal rooftop solar installations by Genius Solar across Indore — elevated structures, family homes, metal-sheet roofs and handovers, with locations and details.
Free survey · No obligation
Your roof is already earning. Start collecting.
Tell us a little about your property. An engineer calls back, books a free site survey and sends a clear, itemised quote.