# Hybrid Solar with Battery Backup in Indore

> Hybrid solar systems with battery backup and off-grid solar for Indore homes, clinics, offices and farmhouses — keep essentials running during power cuts.

Canonical: https://geniussolarservices.com/services/hybrid-off-grid-solar-indore

Hybrid solar systems combine rooftop panels, a hybrid inverter and a battery so essential loads keep running during power cuts, while still exporting surplus to the grid under net metering. Off-grid systems run entirely on panels and batteries without a grid connection. Genius Solar designs both for Indore homes, clinics, home offices and farmhouses, sizing the battery to the loads that genuinely need backup rather than the whole building.

## Included

- **Backup load study:** We list what must run in an outage and for how long.
- **Hybrid inverter:** Manages solar, battery and grid automatically.
- **Battery sizing:** Lithium (LFP) or lead-acid, sized to backup needs.
- **Separate backup circuit:** Essential loads wired to a dedicated backup board.
- **Net metering:** Hybrid systems still export surplus where applicable.
- **Off-grid design:** For sites without reliable grid supply.


## Who needs a battery?

Most Indore homes don't — net metering makes on-grid solar the best value. A battery makes sense when outages are frequent or long, or when equipment must not stop (clinics, home offices, cold storage).

## Sizing backup the smart way

| Backup need | Typical load | Battery (usable) |
|---|---|---|
| Lights, fans, Wi-Fi for 4 h | ~400 W | ~2 kWh |
| Plus refrigerator and TV | ~700 W | ~3–4 kWh |
| Home office with 2 laptops, printer | ~900 W | ~4–5 kWh |

We wire only these circuits to the backup board, which keeps the battery small and affordable.

## On-grid vs hybrid vs off-grid

See the full comparison: [on-grid vs off-grid vs hybrid](/learn/on-grid-vs-off-grid-vs-hybrid-solar).


## FAQ

### Can a hybrid solar system run an AC during a power cut?

It can, but running ACs from a battery needs a large, expensive battery bank. Most customers back up lights, fans, Wi-Fi and the refrigerator, and let ACs wait for the grid.

### How long do solar batteries last?

Lithium iron phosphate (LFP) batteries typically last 6–10 years or several thousand cycles; lead-acid batteries 3–5 years with maintenance.

---

**Genius Solar Services** · G-1, Swarna Palace, Plot No. 1108, Scheme No. 114, Part 1, Vijay Nagar, Near MP Gramin Bank, Indore, Madhya Pradesh 452010 · Phone +91 98267 12299, +91 78288 12299, 0731 400 4499 · geniussolarservices@gmail.com · Mon – Sat · 10:00 am – 7:00 pm
Source: https://geniussolarservices.com
